General Contractor
in Cornwall-on-Hudson, NY
Serving Cornwall-on-Hudson, Orange — licensed general contractor for high-specification residential builds and renovations.
Our Services
Six Disciplines.
Built for Cornwall-on-Hudson.
Every project in Cornwall-on-Hudson is delivered by the same dedicated JMR team — from permit application through certificate of occupancy. One integrated team. Zero subcontracted surprises.
Custom Homes
New construction in Cornwall-on-Hudson is evaluated for compatibility with the surrounding period streetscape — a process JMR manages from design development through certificate of occupancy.
Kitchen Remodeling
Kitchen renovations in Cornwall-on-Hudson typically involve working within period structural layouts — preserving original millwork and ceiling heights while integrating modern appliances and MEP systems.
Roofing
period homes in Cornwall-on-Hudson often feature steep pitches, dormers, and period materials — slate, cedar shake — that require experienced estimation and precise, material-matched execution.
Home Remodeling
Full home renovations in Cornwall-on-Hudson balance the original period character of the property against current code requirements and contemporary lifestyle expectations.
Bathroom Remodeling
period homes in Cornwall-on-Hudson frequently feature original cast-iron fixtures and period tile configurations that require skilled hands to restore or sensitively replace.
Deck Construction
Exterior additions in Cornwall-on-Hudson require careful material selection and massing to complement the existing period profile of the home and satisfy local setback regulations.
Serving Cornwall-on-Hudson homeowners across all six disciplines
View All Orange County LocationsVerified Reviews
What Orange County Homeowners Say
Excellent craftsmanship and quality. They worked quickly and with great attention to detail. The kitchen is beautiful — exactly what we envisioned. Absolutely recommended.
Mingo Montes
Kitchen Remodeling · October 2025
We had a complex job — load-bearing wall removal, custom island, full mechanical relocation. JMR managed the structural engineer, the cabinet shop, and the stone fabricator without us needing to coordinate anything. Came in on schedule. The kitchen is exactly what we specified.
Robert Chen
Kitchen Remodeling · August 2025
JMR gutted and rebuilt our master bath from the studs. They coordinated the plumber and electrician themselves — we had one contact for the entire project. The result is exactly what we approved in the specification. Clean site every day. No surprises at any stage.
James Morley
Bathroom Remodeling · June 2025
Common Questions
Cornwall-on-Hudson,
Answered.
Permit timelines, material considerations, and what to expect from a project in Cornwall-on-Hudson.
Ask Us DirectlyWhat are the building permit requirements for a home renovation in Orange County?
Building permits in Orange County are issued by individual Town or Village building departments — the county has no unified building authority. Projects involving significant site work, including grading, tree removal, or proximity to regulated waterways, may also require review by the applicable municipality's Conservation Advisory Council and, in some cases, the NYS Department of Environmental Conservation. JMR conducts a comprehensive permit pathway assessment at the initial site visit for every Orange County project.
Are there special regulations for Orange County properties near the Hudson River or protected lands?
Properties adjacent to the Hudson River, the Ramapo River, and Catskill Creek tributaries fall within NYS DEC jurisdiction for work within regulated setback distances. In Tuxedo Park, Cornwall-on-Hudson, and Highland Falls, proximity to Hudson Highlands State Park creates additional environmental review requirements for excavation, grading, and impervious surface changes. JMR identifies all applicable regulatory touchpoints at the initial site visit.
How long does custom home permitting take in Orange County?
Custom home construction in Orange County typically requires Town Planning Board approval in addition to a building permit — a process that can run 5–9 months from initial application to permit issuance, depending on the municipality and project complexity. Environmental review under SEQRA may add time for projects with significant site disturbance. JMR maps the full permitting timeline at the pre-construction project planning stage.
Begin Your Project
Let's Build Something
Worth Inheriting.
Custom homes and full renovations from $150,000 — across Westchester County, Rockland, and NYC. A limited number of engagements accepted each year.
Request a Private ConsultationOr call us directly: (646) 581-0754
No commitment required · No unsolicited follow-up · Your project details stay between us